Australian Natural Resources Atlas

Economics - Millicent Coast

Millicent Coast

Location map of Basin Millicent Coast

What was included in the economic assessment of Australia's natural resource base?

New data sets have been developed through the National Land and Water Resources Audit that relate to economic aspects of natural resource management in Australia. There is a focus on resources used to support agriculture and resources impacted by agriculture. The Australia-wide report provides:

Consistent with protocols used by the Australian Bureau of Statistics and the Australian Bureau of Agriculture and Resource Economics, the database provides a new capacity to integrate natural resource information in Australia. The data sets are primarily built for the 1996/97 financial year, the year of an agricultural census. Except where stated otherwise, all dollar values given are in 1996/97 dollars.

Most of the data is represented on a 1km by 1km grid covering agricultural land. Whilst modelled at this level of spatial detail interpretation should generally occur at coarser levels. Data on downstream infrastructure costs of deteriorating water quality has been assembled by river basin.

Context for understanding the natural resource accounts for Millicent Coast

Attribute Unit Basin value Median Australia-wide value
Total basin area ha 3,437,879 909,531
Non-agricultural area ha 671,499 299,341
Agricultural area ha 2,766,380 477,706
Irrigated agricultural area in 1996/97 ha 58,907 2,458
Dryland agricultural area in 1996/97 ha 2,707,473 468,383

Agricultural profit in Millicent Coast

Attribute Unit Basin value Median Australia-wide value
1996/97 Gross revenue $000 609,193 27,636
1996/97 Variable costs $000 141,277 8,654
1996/97 Fixed costs $000 371,057 12,744
1996/97 Profit at full equity $000 96,859 2,621
1996/97 Government Support $000 43,672 1,827
1996/97 Economic returns $000 53,187 707
5yr (1992/93 - 1996/97) Gross revenue $000 601,783 31,139
5yr (1992/93 - 1996/97) Total costs $000 513,364 23,408
5yr (1992/93 - 1996/97) Profit at full equity $000 88,419 6,194
Irrigated agriculture 5yr profit at full equity $000 63,426 4,226
Dryland agriculture 5yr profit at full equity $000 24,993 2,817
Minimum area of basin needed to produce 80% of profit at full equity within basin ha 61,441 16,340
Ranking of basin in order of contribution to national 1996/97 profit at full equity # 112 no data

Costs of resource use to agriculture in Millicent Coast

Attribute Unit Basin value Median Australia-wide value
Area where NPV of lime application is positive ha 98 7,265
Area where NPV of gypsum application is positive ha 77,851 2,013
Area where NPV of lime and gypsum application is positive ha 3,532 1,496
Area where dryland salinity caused yield loss in 2000 ha 281,623 1,015
Area where dryland salinity may cause yield loss in 2020 ha 459,072 1,702
Gross benefit from ameliorating acidic soils $000 747 1,232
Gross benefit from ameliorating sodic soils $000 29,418 666
Gross benefit from ameliorating saline soils $000 21,221 152
Limiting factor gross benefit $000 47,876 2,422
Impact cost of dryland salinity to agriculture from 2000 to 2020 $000 13,175 48
Present value of dryland salinity impact cost to agriculture from 2000 to 2020 $000 73,091 266
Net present value of lime application $000 13 10,411
Net present value of gypsum application $000 68,458 1,046
Net present value of lime and gypsum application $000 10,190 4,133

Costs of resource use - offsite / downstream in Millicent Coast

Attribute Unit Basin value Median Australia-wide value
Local infrastructure cost of salinity and water table rise 2000 $000/yr 1,792 56
Local infrastructure cost of salinity and water table rise 2020 $000/yr 3,936 79
Present value of increase in local infrastructure costs from salinity & rising water tables from 2000 to 2020 11,894 76
•1% increase in salt loads $000 4,648 240
•5% increase in salt loads $000 23,241 1,201
•10% increase in salt loads $000 46,483 2,401
•1% increase in turbidity $000 no data 169
•5% increase in turbidity $000 no data 414
•10% increase in turbidity $000 no data 744
•1% increase in sediment loads $000 1 4
•5% increase in sediment loads $000 4 19
•10% increase in sediment loads $000 7 35

Further information

View the Australians and Natural Resource Management 2002 (theme) report.

View other Audit assessments by clicking the links below:

View "Natural Resource Economics" project and technical reports:

A project report has been prepared by CSIRO Land and Water Policy and Economic Research Unit in the development of this work:

The technical appendices of "Values of returns to land and water and costs of degradation" report contain detailed descriptions of the methods used in this work:

The technical appendices of "Values of returns to land and water and costs of degradation" report also includes a number of component project reports. These report may be viewed separately:

Case study: View or download a technical report and appendices on dryland salinity:
View "People" project and technical reports:

This report does not contain maps and needs to be read in conjunction with:

Link to the Map Maker to view economic data.

Link to the Australian Natural Resources Data Library - to download economic and social data

Before you download

Most publications are downloadable as PDF files. Adobe Acrobat Reader  is required to view PDF files.

If you are unable to access a publication, please contact us to organise a suitable alternative format.

Key

   Links to an another web site
   Opens a pop-up window